Workshop Update 12th August 2018

Sunday, 12th August, 2018

BR Standard Class 4 mt  2-6-4T  loco   No 80097

 

Good progress is being made with more gauge pipework fitted and the handrail pedestals being made. All the superheater elements have been fitted and bolted up. The main steam pipes to the cylinders are now installed. Painting to the underside of the tanks has been carried out, the bracing bars between the boiler and water tanks fitted, the blowdown mechanism assembled and the vac connections refurbished.

 

A big step has been the cab roof lifted and bolted in place. 

 

 

Ivatt ‘Mogul’ Class 2 MT 2-6-0  No 46428

 

No current activity is taking place.

 

 

Pictures are:

          

            Cab gauges and pipework

 

            Smokebox with superheater elements and main steam pipes fitted

 

            Cab roof refitted

Workshop Update 12th August 2018 Workshop Update 12th August 2018 Workshop Update 12th August 2018